The Stormwater Consortium of Rockland County was formed between Cornell Cooperative Extension and the towns and villages of Rockland County to collaborate and share resources on stormwater management.

The Consortium is comprised of  all 24 Towns and Villages within Rockland County who must abide by the  NYSDEC stormwater permit (the ‘Municipal Separate Storm Sewer (“MS4”) permit). The intention of the MS4 permit is to reduce Pollutants of Concern commonly associated with stormwater pollution to the maximum extent practicable. Establishing a Consortium has provided a platform for the exchange of information, grant funding, and ideas for meeting the current and proposed permit requirements. The MS4 permit has six minimum measures, as outlined below.

  1. Public Education and Outreach
  2. Public Involvement and Participation
  3. Illicit Discharge Detection and Elimination(IDDE)Illicit Stormwater Discharge (SCRC)
  4. Construction Site Stormwater Runoff Control
  5. Post Construction Stormwater Management in New Development and Redevelopment
  6. Pollution Prevention and Good Housekeeping in Municipal Operations

More information on the MS4 permit can be found on the Stormwater Consortium of Rockland County information website.

Contact

Jennifer Zunino-Smith
Environmental Resource Educator
Email: [email protected]
Phone: (845) 429-7085 x125

Village Stormwater Principal Executive Officer:  Mayor Lance N. Millman – (845) 368-2211

Stormwater Management Officer:   Martin K. Spence, PE – (201)934-0300  Email:  [email protected]

Contact Stormwater Management Officer to report illicit discharges, or complaints related to construction stormwater activity.

 

Annual MS4 Report

Below are a list of the annual MS4 Reports for the Village of Montebello:

NameSizeDownloads
Annual MS4 Report 2022-20231.0 MB151
Annual MS4 Report 2021-20221.0 MB272
Annual MS4 Report 2020-20211.1 MB251
Annual MS4 Report 2019-20201.1 MB215
Annual MS4 Report 2018-20191.0 MB296
Annual MS4 Report 2017-20181.0 MB220
Annual MS4 Report 2016-20171.0 MB236
APRIL 24, 2025 ZONING BOARD AND PUBLIC HEARING CANCELED. THE NEXT MEETING AND PUBLIC HEARING WILL TAKE PLACE ON MAY 15, 2025.
Skip to content